Regular maintenance and repairs - 2022

Regular maintenance and repairs - 2022

Postby admin » Fri Oct 21, 2022 3:41 pm

Dear apartment owners,
In Riviera Fort we have started the preparation for the autumn-winter season and the next holiday season. We are currently working on and planning to do the following:
1. Tennis court - painting the columns on the inside.
2. Trash bins - full painting.
3. Benches - full painting.
4. Metallic frames of the shower cabins - full painting.
5. Sewer shaft covers - full painting.
6. Air conditioner stands - partial painting.
7. Balcony railings - partial painting.
8. Balcony visors in sections B1 and B2 (mineral plaster) - brush cleaning of the mold.
9. The wooden part of the stair railings in all entrances - fully varnished.
10. The lamp posts on the complex territory - full painting.
11. Playground - complete painting of all the metal elements.
12. Complex fence - partial painting. From section A-2 to the main portal from the sea side -
full painting.
13. Entrance portals - full painting.
14. The open air gym - full painting of the metallic parts.
15. Electric switchboards - full painting.
16. Railings to the sea - full painting.
17. All metallic parts in the elevator shafts - cleaning and full painting. Elevator shafts -
waterproofing and applying silicone.
18. The tiles in the complex - water jet cleaning.
19. 1st floors of all entrances - painting.
20. Lawns - trimming and cleaning. Preparation for the winter season.
21. Drainage systems - cleaning.
22. Inspection of all the roofs.
23. Repair of the rain drains. Replacement of defective parts and replacement
Of the broken facade fasteners.
24. Repair of the building facades.

Image

Image

Image

Image

Image

Image

Image

Image
admin
Site Admin
 
Posts: 237
Joined: Tue Nov 21, 2006 2:15 pm
Location: Sofia, BG

Return to RIVIERA FORT BEACH

Who is online

Users browsing this forum: No registered users and 2 guests

cron